Education

College Station K-8 Schoool , College Station TX:  HVAC and plumbing design for a new K-8 grade school for the International Leadership of Texas.  The school is approximately 95,000 sq ft and included classrooms, cafeteria, gymnasium, active areas and administrative offices.
Sage Completed Sage International School of Boise: The work included a 30,000 square foot tenant improvement at an existing mall. The existing space was removed down to the shell, including all
plumbing and mechanical systems, which were then installed as required for the new floor plan. Careful attention was given to occupant comfort and ventilation air to ensure an optimal learning environment for the students.
Boise School District STEP:  HVAC and plumbing design to renovate an existing building and to the STEP (Student Transition Education Program) facility.  The design included several new furnaces, exhaust fans, roof ventilator, and new plumbing fixtures.
Hailey Elementary School Remodel: Mechanical design of the new TI spaces in the basement at Hailey Elementary School.  Analysis to ensure existing equipment is adequate to meet the heating, cooling and ventilation requirements of the new spaces.  Services included ductwork design including grilles, registers and diffusers for new spaces served by the heat pumps.
 International Leadership of Texas Charter School: Energy analysis of a proposed K-8 charter school in Garland, Texas.  Energy modeling analysis of inputs, utility costs, stipulated factors, model results and conclusions and recommendations of proposed design.

 

[BACK]